Outage Management, T&D

Pulaski Electric System chooses Milsoft GIS

Milsoft Utility Solutions Inc., Pulaski Electric System in Tennessee has chosen the Milsoft geographic information system (GIS) and field engineering application.

Pulaski Electric System is deploying advanced information technologies to help carry out its mission to empower Giles County’s progress. Already a user of Milsoft Engineering Analysis and Outage Management, the utility has now added Milsoft GIS to their Milsoft E&O System.

Milsoft GIS is used by some 150 electric utilities and consulting firms for electric utility mapping and asset data management. The software incorporates a detailed electric network circuit model and is fully integrated with ESRI GIS tools.

Milsoft Field Engineering enables rapid, efficient collection and use of data from field design and engineering of system additions and improvements. Milsoft GIS and Field Engineering together provide all of the data capture, management and display capabilities that a utility needs to maximize the many benefits of using GIS.