VIDEO: Brazil’s hydropower potential may be completely tapped by 2030

[bc_video account_id=”1214147015″ player_id=”HypJxq3ml” video_id=”3786440300001″ min_width=”480px”]

Brazil‘s potential to generate power from hydroelectric plants will be exhausted by 2030, according to Altino Ventura Filho, the country’s energy secretary.

At an energy event on Friday, Ventura Filho revealed that Brazil’s long-term vision was to expand fossil-fired power generation from natural gas, coal and also nuclear power, according to Business News Americas.

“There are places where the government cannot even conduct studies because they are in indigenous areas or protected reserves,” he was quoted as saying by local paper Valor Econômico.

“Maybe our legislation is rigid and could be reviewed, but it’s the reality. After the period from 2025 to 2030, we don’t plan to build new [hydroelectric] plants.”

Brazil’s installed capacity currently stands at about 130 GW, of which hydro accounts for more than two thirds.

According to Ventura Filho, four new nuclear facilities are due to begin operating by 2030, adding 4 GW to the country’s generation park.

“There is room for all sources. We are going to try to get the maximum from wind and solar without compromising the grid. But there is a limit.”

Previous articleChile to study impact of transmission interconnection
Next articleCon Edison withdraws 345 kV transmission line
The Clarion Energy Content Team is made up of editors from various publications, including POWERGRID International, Power Engineering, Renewable Energy World, Hydro Review, Smart Energy International, and Power Engineering International. Contact the content lead for this publication at Jennifer.Runyon@ClarionEvents.com.

No posts to display