E.On Solar’s Maricopa West solar power facility starts construction

E.On Solar, a unit of E.On SE, said Maricopa West, a 20 MW (AC) solar project in Kern County, California, has entered the construction phase.

“The start of construction of the Maricopa West project is the result of the shared vision and hard work of E.On’s Solar team, which has established a track-record of engineering best-in-class solar sites in California and other favorable markets,” said Steve Trenholm, CEO, E.On Solar. “We are pleased to work with Signal Energy Constructors to build Maricopa West. This project will create 160 jobs for iron workers, electricians, laborers and other trades while boosting the local economy,” said Trenholm.

Maricopa West occupies land in Southern California purchased by E.On Solar from Maricopa Orchards, LLC.  The solar park will use a single-axis tracking system and consist of 89,000 photovoltaic panels. It will be fully operational later this year.

Previous articleVIDEO: Flexiwatts are what’s up with new energy efficiency report
Next articleExelon, Pepco review options after D.C. regulators block merger
The Clarion Energy Content Team is made up of editors from various publications, including POWERGRID International, Power Engineering, Renewable Energy World, Hydro Review, Smart Energy International, and Power Engineering International. Contact the content lead for this publication at Jennifer.Runyon@ClarionEvents.com.

No posts to display