Senate approves license for American Falls Dam project

Legislation introduced by Sen. Jim Risch (R-Idaho) and co-sponsored by Senator Mike Crapo (R-Idaho) to provide a license extension for the American Falls Reservoir District No. 2 project passed the U.S. Senate June 20 by unanimous consent.

The American Falls Dam Reservoir No. 2 was completed in 1927 as a state hydropower project and operates under a license from the Federal Energy Regulatory Commission (FERC). The license is expired and FERC re-licensing requires congressional action and presidential approval.

S. 276 was introduced by Sen. Risch in the Energy and Natural Resources Committee earlier this year. The re-licensure will allow construction and efficiency work on American Falls Dam Reservoir No. 2.

The American Falls Dam system contains 1,700,000 acre-feet of water with 125 miles of shoreline. American Falls Dam Reservoir No. 2 is operated by the Big Wood Canal Co.

A similar measure passed the U.S. Senate in the last Congress, but was not voted on in the House.

Previous articleJames Miller joins AES Corp. board of directors
Next articleAlstom, RusHydro deepen business relationship

No posts to display