Calpine to build in Miss.:

Calpine to build in Miss.:

Calpine Corp. plans to build, own and operate an 800 MW natural gas-fired facility, the Lone Oak Energy Center, in Lowndes County, Miss. Representing a $425 million investment, the center is expected to enter commercial operation in early 2003.

Previous articlePOWERGRID_INTERNATIONAL Volume 5 Issue 2
Next articleELP Volume 78 Issue 4

No posts to display