Great River Energy to build Minn. peaker:

Great River Energy to build Minn. peaker:

Great River Energy, a G&T cooperative in Elk River, Minn., plans to construct a 445 MW natural gas-fired facility near Pleasant Valley, Minn. Construction will begin in the second quarter of 2000. The plant will provide peaking power to Great River Energy`s 29 member distribution cooperatives beginning in spring 2001.

Previous articleELP Volume 77 Issue 9
Next articleELP Volume 77 Issue 10

No posts to display