TWC Construction and ProCaps Laboratories contract with DT Solar to install solar electric system

Long Beach, CA, Sept. 26, 2007 — DT Solar, together with ProCaps Laboratories and TWC Construction, announced they will work together to design and install a 700 kW solar electric generating system at the headquarters of ProCaps and TWC in Henderson, Nevada.

The 700 kW system will be installed as part of a steel structure covering a parking lot adjacent to the 200,000 square foot ProCaps headquarters. Both ProCaps and TWC Construction will be supplied with the electricity generated by the project. The system, in conjunction with a solar array already in place, will provide nearly 1 MW of solar power during the midday hours.

The solar project will be designed and supplied by DT Solar and installed by TWC Construction. When completed, the system will comprise nearly 2300 Schott solar modules and is expected to generate more than 1,000,000 kWh of solar electricity annually for TWC Construction and ProCaps Labs.

For more news and exclusive features from Utility Automation & Engineering T&D and Electric Light & Power online, please click here.

Previous articleGE invests in third Airtricity wind farm in Texas
Next articlePSE&G supports BPU’s solar market transition plan

No posts to display