DQE Enterprises and Duquesne Light select Beacon Power’s flywheel systems for field trials

The flywheel system will replace existing battery-powered back-up systems. Beacon’s 20C1000 flywheel is the first non-battery powered back-up system that offers a dependable, long-lasting and cost-effective alternative to lead-acid battery back-up systems.

WASHINGTON, June 26, 2001 – The National Rural Electric Cooperative Association (NRECA) Chief Executive Officer Glenn English today called for the development of a fully interconnected national grid for the transmission of electricity.

Previous articleUtility asset monitoring company lands $16.5 million in venture capital
Next articleMontana Power reaches agreement ending industrial energy supply contract

No posts to display